Skip to content
Butterfly
If you’re replacing a system · Asset and maintenance

A controlled exit from your asset and maintenance system.

Move off a maintenance system with an expensive license where every change becomes a project. Rebuild asset records, maintenance plans and failure processes on a single platform.

~55,000assets migrated
~2.5 monthsmigration duration
4modules in production

A manufacturing organization moving from a legacy asset and maintenance system to Butterfly.

Organizations that trust Butterfly
VodafoneFloReebokNine WestMetro IstanbulDoğuş MediaTypekuvazNTVDiscoveryTLCKoleksiyonLumberjackGQVogueDeva Holding CompaniesKoray KimyaPuhu TVDMAX
What gets migrated?

Work that lives in the old system moves over complete.

01

Asset records

Transferred from a measured inventory with serial numbers, manufacturer, location and request history; assets are grouped.

02

Periodic maintenance

A 12-month plan is generated, tasks are opened weekly and assigned to the responsible person; if the approver rejects, the task goes back to the responsible person.

03

Meter-based maintenance

A threshold is calculated for runtime-based equipment; if maintenance isn’t needed, the task closes automatically.

04

Failure reports and work requests

Failure, maintenance and change requests are classified and enter the same flow.

05

Site visit

Maintenance steps are checked off and materials used and measurements are entered; a task can’t be sent for approval until it’s complete.

06

ERP connection and permissions

Material and inventory reports come from the ERP; permissions are defined per screen and per action.

Validation

Migration closes with measurement.

~55,000
assets on a single platform.
~2.5 months
to exit the legacy system.
Live
periodic maintenance, failure reporting and work request modules in production.
Limits are written down up front

Material usage is kept in the maintenance record for information only; stock movements stay in the ERP. Which data stays in which system is decided before the migration.

After migration

When a maintenance rule changes, no software project is opened; the process owner makes the change on their own schedule.

Let’s decide where to start, together.

In a discovery call, let’s talk about your existing systems and your priority process, and define the right starting area for you together.